Saraya Alsalt Mall Project

Project location

The project is located on plot No.308 Basin (40 North Cypress) of Salt lands, located at the main intersection linking the Amman-Salt main road with Ain Al- Basha Road.

Project objective

The aim of establishing this multi-use project in the Al Saru area – Salt is to develop the area in general and make it a tourist, residential and commercial attraction point, considered the first of its kind in the Salt area in particular and in the Hashemite Kingdom of Jordan in general, by providing a residential tower with a distinguished level and services in addition to providing two towers, one of which is a hotel with a classification4 stars and the other hotel apartments, both of which are managed by a global operator, Hilton, in addition to providing a commercial center that contains many distinctive brands of shops, entertainment areas for the family, cinemas and various restaurants, in order to serve the surrounding areas and provide them with all the services and modern entertainment means that they need, in addition to providing job opportunities and a high income for the Salt region and its municipality in particular and the surrounding areas in general, as it will provide more than 5,000 job opportunities in addition to providing the Salt Municipality with financial amounts through professional licenses for shops and rented commercial spaces.

Project components

The project is a multi-use building divided vertically into three main parts.:

1.  Parking spaces -Parking :

Three settlements allocated for parking and services – electromechanical – with a total area of approximately   73,035 m² in addition to external parking spaces according to the following tables:

 Parking Lot Floor Area Table

AreaFloor
24345Fifth settlement
24345Fourth settlement
24345Third settlement
  
73035TOTAL

 Project Vehicle Distribution Schedule

The TotalParking spaces reserved for the residential towerParking spaces for the hotel and hotel apartmentsDedicated parking for the mallFloor
499499Fifth basement floor
51067111332Fourth basement floor
492111381Third basement floor
1052- Bus for visitors
2- Bus for workers


105

Exposed parking spaces
ground floor

     

1606

67

222

1317
TOTAL

2.  Podium

It consists of the commercial center, service floors, and spaces belonging to the three towers, with an approximate total area of 84,723m²:

It consists of six levels:

  • The second basement floor, which contains:
    • Shops of various sizes
    • designated areas for banks
    • Areas designated for telecommunications companies
    • Space allocated for Carrefour Supermarket -Carrefour Hypermarket
    • Hotel and apartment service areas -BOH
    • Mall service areas
  • First basement floor which contains:
    • Hotel and apartment service areas -BOH
  • Ground floor which contains:
    • Shops of various sizes
    • Carrefour Supermarket -Carrefour Hypermarket
    • Special areas for the hotel and hotel apartments, including entrances and seating area FOH
    • Residential Tower Private Areas – Entrance FOH
  • The first floor contains:
    • Shops of various sizes
  • The second floor contains:
    • Shops of various sizes
    • Cinemas
    • Entertainment area for children and family
    • A restaurant hall in addition to areas designated for cafes and outdoor seating
  • The third lower floor, which contains:
    • A restaurant hall in addition to areas designated for cafes and outdoor seating
    • Cinema service area
    • Electromechanical services area

 Floor Area Table PODIUM

Aria Floor
24345 Second basement floor
1750 First basement floor
18425 ground floor
18425

First floor

18505 second floor
3273 lower third floor
   
84723 TOTAL

3. Horoscopes :

The project includes three towers:

  • Hotel Tower – Tower ((A and operated by Messr Hilton under the Double Tree by Hilton brand Consisting of (10) Floors above the roof of the mall, containing various hotel rooms and different services: restaurants, meeting rooms, a health club, and a swimming pool, with various spaces and a distinctive design to serve the different tastes of guests, according to the following table:

Hotel Room Area and Distribution Table

Total Number in the Tower Approximate Room Area Room Type
79 31 King Guestroom
35 31 Twin Guestroom
2 45 Accessible Guestroom
12 85 Junior suite
     
     
     
128 TOTAL

4. Project area :

Approximate total area of the project (207,546 m²) distributed as follows:

Hotel Room Area and Distribution Table

Comments Approximate Area Project Components
Including all parking spaces in addition to the electromechanical services of the mall and the three towers 73035 Settlements – Fifth to Third
Including all services and spaces of the mall and the three towers 84723 Mall -PODIUM
It was calculated from the top of the mall 17354 Residential tower
It was calculated from the top of the mall 17354 Hotel Tower
It was calculated from the top of the mall 14490 Hotel Tower
  590 Duplicate drawers and services
     
  207546 TOTAL

Official Project Approvals :

  • Approval was obtained to change the use of the project land from agricultural to central commercial, with special provisio
  • Initial approval for the designs has been obtained from the Ministry of Municipal Affair
  • Initial approval for the designs was obtained from the Greater Salt Municipali
  • Approval of the Jordanian Geologists Syndicate was obtained.
  • Approval from the Ministry of Environment has been obtained.
  • Approval from the Department of Antiquities has been obtained.
  • The electricity company has been contacted regarding the provision of electrical power for the project. Negotiations regarding the location of the project’s main station have been completed. Work is currently underway to obtain final approvals from the electricity company in this regar
  • Zero-rate tax exemptions were obtained according to the Cabinet decision and for a period of (6) Years.

 

Design and Consulting Services Contracts:

  • Al Nasser & Partners Consulting Engineers has been contracted to provide design and supervision services for the project. Initial designs have been developed and the necessary approvals have been obtained from the relevant municipalities and department Work is currently underway to develop the project’s engineering plans with the aim of obtaining final approvals.
  • The consultant’s office was contracted for engineeri engicon To conduct a traffic study for the project, which was approved by the Ministry of Housing. The consultant provided the necessary recommendations to the owner and designer, and these were sent to the Salt Municipality.
  • Al-Shamil Engineering Office was contracted to conduct an environmental impact study for the projec A workshop was held with representatives of relevant government departments in attendance. The study was submitted to the Ministry of Environment and the necessary approvals were obtained.
  • The Arab Center for Engineering Studies has been contracted ((Aces This is to provide soil testing and site survey service The study has been completed and approved by the Jordanian Engineers Association.
  • The company was contracted with yellow and COA global company based in France has been providing services to study vehicle parking and movement inside and outside the projec Recommendations have been submitted and work is currently underway to implement the recommendations in full coordination with Al Nasser & Partners Consulting Engineers, the project’s main designer.
  • The company was contracted with RHI studio” International Based in the United States, the company is providing design services for the project’s cinema area. The preliminary designs were completed in close coordination with Al Nasser & Partners Consulting Engineers, the project’s lead desig
  • The company was contracted with PWC It is considered one of the most important international companies providing economic feasibility studies for the projec The study has been completed.
  • The company was contracted withRE² – consultant INC. “The global company, headquartered in Canada, provides services for studying commercial spaces and the quality of commercial stores. The study has been completed and the final report has been prepared in this regard in full coordination with Al Nasser & Partners Consulting Engineers, the main designer of the project, with the aim of including it in the pla
    • An agreement has been reached with a group of specialized companies in multiple technical fields related to advanced design stages, as follows:
 Company
Name
Field of
expertise
1

Acoustics Middle East
and Technical Services FZE

Acoustic Consulting
Services
 


2

WEAVERANT FZE

Information Technology
(IT) and Communications
Consulting Services


3

RHO Technical Services
LLC

Kitchen and Laundry Room
Design and Technical Consulting Services
 

4

Tenable Fire Engineering
Consultancy

Fire Protection and Fire
System Consulting Services
 

5

NV5 Information
Technology Consultant

Security Threat and Risk
Assessment

Consulting Services

 

Lease Contracts and Memoranda of Understanding:

  • An operation and management contract for the hotel tower (the tower) was signed. (A) Hotel, Hotel apartments (B) and apartment for sale (C) by Hilton with an international operator, “Hilton Company”, to operate the project through their brand “DoubleTree by Hilton”.
  • Work is currently underway to sign a memorandum of understanding to operate the cinema area with Mes Prime Cinema “For an approximate area (3750 m²)
  • A memorandum of understanding was signed with Galaxy Park To operate the family entertainment area, which is estimated at (4650 m²)
  • A memorandum of understanding was signed with Mess Carrefour – Carrefour” to operate the Hyper market with an approximate area of (3800 m²) and cancelled recently due to completion of work in Jordan and we are looking for new partner
  • A memorandum of understanding with a group specialized in owning a group of international brands in the field of clothing and accessories, namely “Mahmoud Al-Bash Group of Companies,” to rent an area of approximately (3300 m²)